DISCIPLINES OF STUDY

In order for the Electromechanical Installation Systems to work smoothly, the five disciplines associated with each other should be constructed in their interior and coordinate with each other without error.

​

1- Design and projecting............

2- Planning...................................

3- Material supply and logistics..

4- Application..............................

5- Control and verification..........

1- Design and projecting;
The Promechi sets out with the approach to each project with its own needs.
The template projects are not used and the original solutions are produced with the engineering approach for each project.
When designing the application and financial dimensions are taken into account.

Projects are designed to be superposition of three-dimensional and different disciplines and are created in the field applicable projects.
Comfort requirements are optimized, without being ignored.

In addition in line with the investor demand the energy efficiency view is added to the investment and investment with lifetime cost calculations.

​

2- Planning;
The planning phase is created with four subscales.

  • Time plans.

    • It is coordinated with the current business plan the mechanical work program is generated.

  • Material current program.

    • According to the work program and taking into account the supply times the material order program is created.

    • The appropriate suppliers are listed.

  • Team Planning.

    • The work program and the Statistical Man are the personnel planning to be found on the field by taking into account the clock data.

    • The team and the avidability of the staff will be needed are planned.

    • Camp planning is made to serve staff.

  • Cash flow planning.

    • Payments plan is generated according to materials and team planning.

    • According to the business plan the prescribed deservion amounts are calculated.

    • The cash flow plan is created and financial preparations are planned.

​

3- Material supply and logistics;

The correct material selection is from the most important stages of healthy mechanical installation applications.

The materials and equipment needed are selected in accordance with the specifications such as capacity, measure, pressure grade.

With quality documents, test certificates and reference information, the material selection files are created and the employer approval is taken.

The most appropriate suppliers to the project location are selected by selecting the planned dates.

All materials coming to the field are controlled to the bids and orders to the repository and stored properly.

The material input and outputs are checked at all the current inventory situations by registering input and outputs.

The material deficiencies that may hinder the application are followed by the measure.

​

4- Application;

Healthy Field Application has four main requirements.

  • Suitable, qualified staff.

    • Promechi, works with his own staff which is bred with experience based on years continuity.

    • For all personnel, the files covering the knowledge of the knowledge, professional competences and performance data are kept.

  • Camp planning for staff.

    • Having employee personnel are healthy and peaceful is reflected in the quality of work done. Clean, healthy accommodation and bathroom facilities are provided in this direction

    • The food needs of working staff are met in a way that the staff will be satisfied.

  • Providing seamless and adequate work tools.

    • The application is done absolutely smoothly and using suitable tools.

    • Inventory records of all work machinery and equipment are kept. At the necessary times, they are maintained without waiting for the trouble sticker.. Teams that fill up the life are removed from the field.

  • Adherence to occupational safety measures.

    • All employees have received occupational safety training in accordance with the job.

    • All staff are equipped with the necessary protection equipment and operate in accordance with the job security rules on the field under all conditions.

​

5- Control and verification;

The control process is activated at every stage of the application.

  • The first step begins during the purchase of the material. The problem materials are not inserted in the field in any way.

  • All equipment to be used in the construction of the work are taken to the field after checking and testing.

  • The study of staff is continuously monitored in terms of both business safety and business quality.

  • Completed business processes are delivered to the employer with the minutes after the appropriate test operations are performed.

After the application is terminated the systems are activated.
The necessary adjustments after the measurements are confirmed and certified that the system can meet the designed capacities.
All warranty documents reports and minutes are fitted together and delivered to the employer.

​

​

​

YOUR QUESTIONS SUGGESTIONS AN COMPLAINTS ARE VERY VALUABLE TO US.
PLEASE CONTACT US YOU WILL BE RETURNED TO YOU AS SOON AS  POSSIBLE

Our expertise in the mechanical installation sector is mainly industrial, public housing, trade center, hospital, school etc. In areas, we offer the most affordable price and the latest technology to the service of our customers.